Manufacturer · Qingdao, China · EXW / FOB Qingdao

About Qingdao Cookimech

Qingdao Cookimech manufactures processing equipment for two liquid food streams: dairy and liquid egg. We supply individual machines to plants adding or replacing one stage, and complete lines to processors building from an empty floor.

Cutting, welding, polishing and assembly happen in our own workshop in Qingdao. That is why we can size equipment to your throughput instead of asking you to pick the nearest catalogue model, and why a design change does not have to be negotiated with a third-party factory.

Cookimech showroom in Qingdao

Why processors buy direct

Controls you can service locally

Siemens components as standard. Where your team needs parts it can source locally, we build to your specified brand — Schneider, Mitsubishi and others on request.

Dairy and liquid egg from one supplier

If your plant runs both a milk line and an egg line, you deal with one supplier, one set of drawings and one spare parts list instead of two.

Sized to your capacity, not to a catalogue

We do not ask you to pick the closest standard model. Tank volumes, heat exchanger area and pump sizing are worked out from the throughput you give us.

Made in our own workshop

Cutting, welding, polishing and assembly happen in our own facility, so a change to a design does not have to be negotiated with a third-party factory.

Material documented with every order

Contact surfaces are SUS304 finished to Ra 0.6 μm, argon-shielded welds, food-grade seals — and a material certificate ships with every machine.

Two-year structural warranty

2 years on tanks, frames and fabricated assemblies; 1 year on electrical and electronic components. Our engineers travel to site for installation and commissioning.

From enquiry to commissioning

  1. You send your requirements

    Raw material, target product, capacity, local voltage and frequency, heating source and destination port. If you are not sure about some of these, tell us what you do know.

  2. We send a process proposal

    A process flow, an equipment list with specifications, a suggested layout and a quotation. If more than one configuration makes sense, we explain the trade-off instead of sending one option.

  3. We manufacture and test

    Fabrication, welding, polishing and assembly in our own workshop. Standard machines ship in 20 days; a complete line in 40–45 days.

  4. Installation and training

    Our engineers travel to site — typically 4 days for installation, commissioning and operator training. Travel and accommodation are covered by the buyer.

Tell us about your process

About three minutes. An engineer reads every request and replies with questions or a process proposal — not an automatic price list.

Start with your numbers

Tell us what you produce. We will size the line.

Product, daily volume, voltage and heating source are enough to start. An engineer replies with a process flow, equipment list and quotation.